BJS Constructions

Services

Our Services

Gray Structure

Buildings and constructions are an essential part of the human experience. We spend our lives, work there.

Guarantee Services

We give best services to our customers
Read More

Finishing

We are providing our finishing services on supervision at 15%.

Guarantee Services

We give best services to our customers

Drawings

Once the concept drawings are finalized by the appointed architects, structural designs are designed to execute your project.

Guarantee Services

We give best services to our customers

Interior Design

The goal of interior designers is to improve the user experience by better managing the space available in the intervened environment.

Guarantee Services

We give best services to our customers

Grey Construction Specification

Rs: 2300/ sq.ft

1) Super Structure

a. 9″ thick brick work in super structure of 1st class brick masonry in cement sand mortar ratio 1:6

b. 4 ½” thick walls will be made with cement sand mortar ratio 1 :4

c. ½” thick cement plaster (1:4) ratio on ceiling, shade and internal walls.

d. Termite treatment will be done by company.

2) Reinforcement Cement Concrete (1:2:4)

a. All reinforced cement concrete in lintel, column, beams and roof slabs will be carried out in ratio (1:2:4)

b. Model deformed 60 grade steel bar will be used in 6 ” RCC Slab. 

3) Public Health and Sanitary Work

a. PVC pipes (Popular) of appropriate size will be used for internal main and sub main lines floor trap. 

b. Water supply cold and hot lines all bathrooms and kitchens will be provided with PPRC (Master)

4) Electrification

a. It shall include conduit PVC pipe (Popular) of ¾ ” , 1″  and 2″ as per requirement in roof slabs and walls 

b. PVC (Popular) fan box; chandler box, light box, ceiling light box, will be provided according to the electric drawing.

C. Popular electric boxes for light plugs, power plugs and for switches will be provided according to the required size.

5) Sewerage

PVC Popular medium 3″, 4″ and 6″ diameter sewer pipes will be used according to drawings. It will be connected to main sewer line.

Need help?